Latest Civil Engineering and Construction Projects in the North of Scotland
 
Civil Engineering Project:
Glendoe Hydro Scheme 2007


Works began on the Glendoe Hydro project during the Christmas of 2005. Our involvement initially with the contract was the construction of the access tunnel portal site to allow the exploratory drilling to works to commence.

Since then, the scope of works carried out dramatically increased. In total 45km of access roads have been constructed, providing the network of roads leading up to the dam reservoir and further out through the entire site. Due to the location of the project, dealing with depths of peat up to 8m deep in places required careful planning to provide suitable storage areas to allow the peat to be reused for final landscaping operations.

Civil Engineering Projects in the North of Scotland including the Glendoe Hydro Scheme, 2007
 

The sub contract for dam embankment construction was awarded to ourselves and work began in November 2006 on the 1km long , 1 million tonne rock fill dam embankment.

In order to produce the vast quantity of rock required, borrow pits and quarries were opened. Drilling & blasting, crushing & screening operations played a vital role in the success of the contract.

Following on from the award of the dam embankment, multiple sub contracts were awarded to ourselves for the network of intake pipelines to supply water to the dam reservoir. In total there are 15 intakes supplying the reservoir. pipelines ranging from 0.6 to 2.0m diameter HDPE weholite pipes.

In total some 9.5 km of pipeline were constructed.

  Work began on the main pipeline contract at the end of August 2007, consisting of 4.5km of 1.8m & 2.0m Weholite pipes including access roads out to the end of the pipeline. This contract is due for completion in August 2008.

Environmental control is a major factor within the project, our control and involvement has been recognised as one of the best in the field of construction works. River diversions and sediment management are amongst the tasks undertaken by our dedicated environmental team.

Further sub contract work has commenced on the extensive reinstatement of the area.

This again is another area of our work recognised for excellence amongst the various authorities.


 
       